Explore a comprehensive database offering in-depth analysis of the South Africa data center market, covering 55 existing and 9 upcoming data centers in key locations such as Johannesburg, Cape Town and Durban. This essential Excel resource provides insight into current and future white-floor space, IT load capacity (2025-2029), and colocation pricing. Major data center operators include Teraco, Open Access Data Centers, and Africa Data Centers. Targeted at REITs, contractors, infrastructure providers and advisory firms, this report is indispensable for navigating South Africa's dynamic data center landscape.
Dublin, April 27, 2026 (Globe Newswire) — The “South Africa Existing and Upcoming Data Center Portfolio” added to database researchandmarkets.com gift.
There are approximately 55 existing data centers in South Africa, with cities such as Johannesburg and Cape Town having a strong presence in the region. Johannesburg alone accounts for more than 70% of the total power capacity, making it the leading data center market in the country.
Teraco (Digital Realty), Open Access Data Centers (OADC), and Africa Data Centers rank among the leading data center operators by capacity across South Africa.
Key Market Highlights:
-
Detailed analysis of 55 existing data centers
-
Detailed analysis of 9 upcoming data centers
-
Locations covered: Bloemfontein, Cape Town, Centurion, Durban, East London, Emalahleni, George, Gkebarha, Grabouw, Johannesburg, Kempton Park, Klein Brak Rivier, Klerksdorp, Knysna, Middleburg, Midrand, Mount Edgecombe, Nelspruit, New Germany, Pietermaritzburg, Pinetown, Plettenberg Bay, Polokwane, Potchefstroom, Pretoria, Rustenburg, Sedgefield, Somerset West/Paarl.
-
Existing white floor space (sq. ft.)
-
Upcoming White Floor Space (Sq. Feet)
-
Current IT load capacity (2025)
-
Future Capacity Addition (2025-2029)
-
retail colocation pricing
-
Bulk Colocation (Per kWh) Pricing
Existing Data Centers (55 facilities)
-
market snapshot
-
Location (region/country/city)
-
facility address
-
Name of operator/owner
-
Name of the data center i.e., (JB2 or JHB1.)
-
Core and Shell Region (White Bottom Region)
-
Core and Shell Power Capacity (IT Load Capacity)
-
rack capacity
-
year of operation
-
Design Standards (Tier I – IV)
-
Power/Cooling Redundancy
Upcoming Data Centers (9 Facilities)
-
investment snapshot
-
Location (region/country/city)
-
Investor Name
-
area (white bottom area)
-
Electrical Capacity (IT Load Capacity)
-
Investment ($million)
-
Power Infrastructure Investment ($million)
-
Mechanical Infrastructure Investment ($million)
-
General Construction Services Investment ($million)
-
declaration year
-
Project Status (Open/Under Construction/Announced and Planned)
-
Active or expected year of opening
